Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13--June 12, 1997

Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13--June 12, 1997
Author :
Publisher :
Total Pages : 10
Release :
ISBN-10 : OCLC:68434758
ISBN-13 :
Rating : 4/5 (58 Downloads)

Book Synopsis Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13--June 12, 1997 by :

Download or read book Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13--June 12, 1997 written by and published by . This book was released on 1997 with total page 10 pages. Available in PDF, EPUB and Kindle. Book excerpt: The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational problems. These wells consist of fourteen producing wells and four injection wells. The producing wells are currently producing a total of approximately 650 bopd, down from a peak rate of 900 bopd. Unit production is currently averaging approximately 3,000 bopd, 12,000 bwpd and 18,000 bwipd. The paper describes progress in core analysis, reservoir surveillance, well stimulation, validation of reservoir characterization (includes thin section analyses, depositional environments, and paleontologic analysis), material balance decline curve analysis, and validation of reservoir simulation (includes geostatistical and deterministic).


Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13--June 12, 1997 Related Books

Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13--June 12, 1997
Language: en
Pages: 10
Authors:
Categories:
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, June 13--September 12, 1997
Language: en
Pages: 50
Authors:
Categories:
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Annual Technical Progress Report, June 13, 1996--June 12, 1997
Language: en
Pages: 16
Authors:
Categories:
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

Infill drilling of wells on a uniform spacing, without regard to reservoir performance and characterization, does not optimize reservoir development because it