National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 6. Northeast Region

National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 6. Northeast Region
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:1065803478
ISBN-13 :
Rating : 4/5 (78 Downloads)

Book Synopsis National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 6. Northeast Region by :

Download or read book National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 6. Northeast Region written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.


National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 6. Northeast Region Related Books

National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 6. Northeast Region
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comp
Preliminary Inventory of Hydropower Resources: Northeast region
Language: en
Pages: 344
Authors:
Categories: Government publications
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 5. Southeast Region
Language: en
Pages: 197
Authors: Wayne R. Sigleo
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

The Preliminary Inventory of Hydropower Resources (PIHR) a preliminary product of the National Hydropower Study (NHS), was published in six (6) volumes (regions
National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 2. Pacific Southwest Region
Language: en
Pages: 139
Authors: Wayne R. Sigleo
Categories:
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK

The Preliminary Inventory of Hydropower Resources (PIHR) a preliminary product of the National Hydropower Study (NHS), was published in six (6) volumes (regions
Preliminary Inventory of Hydropower Resources
Language: en
Pages: 266
Authors:
Categories: Government publications
Type: BOOK - Published: 1979 - Publisher:

DOWNLOAD EBOOK