Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line
Author | : |
Publisher | : |
Total Pages | : 13 |
Release | : 2003 |
ISBN-10 | : OCLC:962178901 |
ISBN-13 | : |
Rating | : 4/5 (01 Downloads) |
Download or read book Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line written by and published by . This book was released on 2003 with total page 13 pages. Available in PDF, EPUB and Kindle. Book excerpt: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. See Section 1 of the attached checklist for a complete description of the proposal.